Upcoming DDOT Work on Connecticut Avenue NW
-Information provided by the District Department of Transportation (DDOT):
Dear Residents/ANCs/Businesses,
The District Department of Transportation (DDOT) will begin roadway resurfacing on the following sections of Connecticut Avenue NW beginning on or about Monday, April 27:
Calvert Street to Kalorama Road NW
California Street to S Street NW
Construction is scheduled to be completed by Friday, May 29, 2020, if weather permits. The contractor is authorized to work Monday through Saturday from 7:00 a.m. to 5:00 p.m.
At least one lane in each direction will be open to traffic during construction. However, curbside parking will not be allowed on some blocks of Connecticut Avenue NW during the construction working days.
Parking restriction signs will be posted at least 72 hours in advance at locations where parking will not be allowed. These signs will notify the duration of “No Parking”, dates of “No Parking” and contact information of the engineer in charge.
Thank you for your patience and understanding during the repair work. Should you have any problems, concerns or suggestions; please contact me at the information below.
Sincerely,
Victor Nwabueze Project Engineer
m. 202.369.9851 e. Victor.nwabueze@dc.gov